Product Overview
The SX 12U 3 Phase Power Distribution Box provides robust power management for industrial and event applications. Featuring a 400A Camlock interface and Schneider safety components, this unit ensures reliable power distribution in demanding environments.
Key Specifications
Parameter | Details |
---|---|
Input/Output | 400A Camlock (3-phase 220V) |
Branch Circuits | 12x L21-30R 120V outlets (32A/phase) |
Main Protection | Schneider 250A/3P breaker |
Branch Protection | Schneider 32A/3P switches |
Monitoring | 120V digital voltage/current meter |
Housing | Shockproof 12U rack design |
Core Features
- Heavy-Duty Power Handling
- 400A Camlock connectors for high-current 3-phase input/output
- 12x L21-30R outlets (120V/32A) with individual Schneider switches
- Professional Safety System
- Schneider 250A main breaker + 12x 32A branch breakers
- Phase imbalance protection and overload cut-off
- Real-Time Monitoring
- Digital display tracks voltage (L1-L2-L3) and current draw
- Customizable Design
- Add/remove outlets, upgrade to IP65 enclosure, or integrate PDUs
Technical Advantages
- Zero Cross-Phase Interference
Isolated busbars prevent voltage fluctuations between circuits - Rugged Construction
2mm steel chassis with vibration-dampening mounts - Quick Deployment
Pre-drilled rack mounting points + front/rear cable management
Applications
- Industrial Workshops – CNC clusters, welding stations
- Temporary Event Power – Festival stages, outdoor exhibitions
- Construction Sites – Crane power distribution
- Data Centers – Backup power routing
Ordering Options
- Standard Unit
12U rack, black finish, basic metering - Upgraded Versions
IP65 weatherproofing, touchscreen monitoring, remote IoT control
Why Choose SX?
- Factory Direct Savings – 40% cheaper than branded equivalents
- 15-Day Warranty – Replacements for DOA units
- Global Compliance – CE, UKCA, and AS/NZS 3000 certifications
FAQ
Q: Can I replace L21-30R with CEE outlets?
A: Yes – specify outlet types during ordering.
Q: Is parallel operation possible?
A: Units can be cascaded for 800A+ capacity.
Q: What’s the lead time for custom orders?
A: 18-25 days for modified configurations.
Request Custom Configuration:
Contact Power Engineers
SEO Keywords:
3 Phase Power Distribution Box, 400A Camlock Distro, Schneider Breaker Power Box, Industrial Power Distribution Rack, Event Power Distribution System, CE-Certified Power Distro, Customizable Power Panel.